Creekview 121 Buildings 5 & 6
This project includes two speculative tilt wall distribution centers totaling 140,000 sf with sitework and infrastructure for two future buildings.
Articles from this Taxonomy
This project includes two speculative tilt wall distribution centers totaling 140,000 sf with sitework and infrastructure for two future buildings.
A 212,155 sf clear tilt wall building at Park 25 Industrial Park in Frisco, TX and the future home of Peinado Construction.
This project is a 56,000 sf end-user tilt wall office/warehouse including a 32,000 sf two-story office building.
This project includes two 100,029 sf tilt wall industrial buildings.
This project consist of an 86 acre Design-Build industrial development with five speculative tilt wall industrial building complex, with clear spans ranging from 32’to 36?, totaling 1,404,400 sf at DFW Airport.?
An approximate 400 acre infrastructure project for DFW Airport for future industrial development at Passport Park including earthwork, site utilities, roadways, duct banks, street lighting and LID landscaping improvements.?
This project is a 305,760 SF 32′ clear tilt wall Industrial facility at Sunfield Industrial Park.
This project consist of a 50,000 SF tilt wall indoor sports complex with 80′ bays.
This project consist of two speculative tilt wall industrial facilities totaling 138,865 SF.
This project consist of two speculative tilt wall industrial facilities totaling 193,935 sf.
This project consist of a 40′ clear, 1,000,584 SF tilt wall industrial facility at DFW Airport.
36? clear tilt wall industrial warehouse building totaling 703,000 sf.
This is one of the first properties to start within the 216-acre development, Frisco Park 25 in Frisco, TX.
This project consist of a 159,908 sf 32′ clear tilt wall industrial building.
215,000 SF?32′ clear steel distribution facility, which includes 100? clear span bays to accommodate 6-15 ton 90? span overhead cranes and 15,000 SF Office.
New 1,200 linear foot manufacturing assembly line for Caterpillar, Inc.
Project includes design management and construction of the new concrete structure with steel supporting system and steel plate surfaces.
840,000 SF concrete tilt wall engine assembly and manufacturing facility.
Includes 40,000 SF of office space.
This 40-acre International Logistics Center which includes three tilt wall warehouse buildings totaling 646,796 SF.
78,000 SF tilt wall food distribution facility, including office, cooler, and freezers.
Two tilt wall warehouse buildings totaling 1,220,000 SF.
Two tilt wall warehouse buildings totaling 488,564 sf.
231,754 SF 32′ clear tilt wall speculative distribution center.
Includes ground up construction with site work.
351,000 SF, 32′ clear tilt wall speculative distribution center and remaining site work from phase 1.
32’Clear, 250,000 SF tilt wall research and development building with TI work included.
323,733 SF, 32′ clear tilt wall manufacturing facility.
Project includes tenant finish out for material packaging facility & 15,000 SF office space.
47,000 SF foundation removal and improved structural replacement.
Roof drain and sanitary systems were also upgraded.
New, ground up 373,860 SF tilt wall 32′ clear, cross-dock distribution center.
430,500 SF 32′ clear tilt wall logistics and light assembly facility.
106,000 SF turbine engine manufacturing and logistics facility.
Project includes: insulated tilt wall panels, overhead cranes, 20? deep test pits, 2 test cells, 1 with 130? tall custom exhaust stack and 30,000 SF of office interiors.
The project includes ground-up construction with site work of an approximately 730,000 SF spec distribution center.
LEED Certified.
182,000 SF paint, assembly and logistics building.
32’Clear, 510,000 SF Parts Distribution and Logistics Facility; an Expansion to the Existing Caterpillar Building.
Includes T8 Warehouse Lighting and 26,000 SF of Office Mezzanine.
805? Linear Foot enclosed Sky Bridge Connector which includes HVAC, dry pipe fire protection, and insulated metal panels.
400,000 SF distribution facility for Dallas Cowboys Merchandising.
Includes 40,000 SF of office and 20,000 SF of mezzanine.
On DFW Airport, project includes: 200,000 SF and 150,000 SF tilt wall speculative distribution facilities and site work.
At DFW Airport, project includes: 120,070 SF, and 143,320 SF tilt wall speculative distribution facilities.
A 26 acre light industrial complex located at DFW Airport, TX
The project includes three tilt wall buildings totaling 347,064 SF.
65,000 SF tilt wall material recovery center (Recycling Facility)
300,000 SF industrial manufacturing / distribution facility for FCA & Gray Interplant.
Project includes tilt wall construction, 30′ clear, ESFR, 26 dock positions, RTU HVAC, and 4,000 amp service.
Design-Build Industrial Development Including Sitework and 3 Speculative Tilt Wall Buildings Totaling 1,051,000 SF.
Mass grading of a 95-acre site and building pad, preparation for a master-planned industrial business park in DeSoto, TX.
Phase I work also includes expansion of Polk Street and Danieldale Road to facilitate entry/egress to the business park.
A 265,000 SF tilt-wall facility is that includes 10,000 SF of bi-level office space and a 6,000 SF central plant.
Building features include a 32-foot clear height, 20,000 AMP dual-feed power services, 1,200 tons of chilled water cooling machining and manufacturing.
A Ground-up 198,000 SF 28′ Clear Distribution Center with Site Work.
821,900 square foot, 36? Clear, Tilt Wall Distribution Facility with Site Work.
261,000 Square Foot Tilt Wall Spec Distribution Center and Mass Grading for Future Development.
1,004,000 SF tilt wall spec distribution center.
This is the second phase to Arlington Commerce Center E which involves a 100,800 SF tilt wall expansion with over 400,000 SF of additional paving.
513,800 SF, 32′ clear tilt wall industrial facility and 300,000 SF storage pad.
CAT Denison 2014 Capital Improvements includes 150,000 square feet of specialized heavy duty paving and utilities.
Project also consists of several major MEP upgrades including specialized lighting, fume exhaust, HVAC, and dust collection systems.
280,000 SF tilt wall expansion of the existing Caterpillar manufacturing facility.
Project includes structural steel frame, machine line foundations, and MEP 20,000 amp service with centrifugal chiller cooling.