Quiet Logistics

Quiet Logistics

Phase one of this project includes the demolition of an existing 250,000 sf building with associated pavement and site improvements.
Phase two consist of new construction of a 328,000 sf air conditioned tilt wall distribution facility with 13,000 sf being office finish out.

Westpark

Westpark

This project is a 648,000 SF, 36′ clear height, speculative tilt wall industrial warehouse with large retaining walls and offsite public road improvements.

Lakeport 2499 Buildings 1-3

Lakeport 2499 Buildings 1-3

This project consist of a three building development of speculative office/warehouse. Building 1 clear height is 24′ and Buildings 2 & 3 are 28′ clear. Envelopes are load bearing tilt-up concrete panels on reinforced concrete foundations. Exterior to be painted concrete panels, glass and thin brick veneer. Building slabs to be 6″ concrete with 10 mil vapor barrier. Roof to be white 45mil TPO mechanically fastened on rigid insulation. Roof structure to be metal deck, steel bar joists and girders supported by steel columns. ESFR wet-pipe fire protection system will be installed per NFPA-13 requirements.