Eagle 35 Phase III Bldgs C, E, F, G, L
Five speculative tilt wall distribution buildings totaling 2,122,200 SF
Articles from this Taxonomy
Five speculative tilt wall distribution buildings totaling 2,122,200 SF
Demolition of an existing 88,000 SF building, followed with the construction of a 298,000 SF rear load speculative warehouse.
Phase I for this project consist of mass grading and infrastructure of 200 acres for current and future phase, and the construction of three speculative tilt wall warehouse buildings totaling 1,049,000 sf.
Two speculative tilt wall industrial facilities on a 55-acre site in totaling 1,006,338 sf.
This project consist of a 40′ clear, 1,000,584 SF tilt wall industrial facility at DFW Airport.
This project consist of a 40′ clear, 1,000,584 SF tilt wall industrial facility at DFW Airport.
370,000 SF tilt up building containing 30,000 SF of office finish out. The building will serve as Corsicana Mattress Company’s flagship hub for their corporate office, retail, manufacturing, and a shipping facility.
Phase I for this project consist of mass grading and infrastructure of 200 acres for current and future phase, and the construction of three speculative tilt wall warehouse buildings totaling 1,049,000 sf.
Phase I for this project consist of mass grading and infrastructure of 200 acres for current and future phase, and the construction of three speculative tilt wall warehouse buildings totaling 1,049,000 sf.
A single load, 36’ clear speculative tilt wall warehouse totaling 196,985 SF
Two speculative tilt wall industrial facilities on a 55-acre site in totaling 1,006,338 sf.
Two speculative tilt wall industrial facilities on a 55-acre site in totaling 1,006,338 sf.
A 36′ clear cross dock tilt wall warehouse building totaling 467,541 SF on a 25 acre site.
Two speculative tilt wall industrial facilities on a 55-acre site in totaling 1,006,338 sf.
425,000 sf, 36’ clear, cross dock warehouse with a future BTS. This project also includes relocating an existing water line and road improvements for DFW Airport.
904,495 SF speculative tilt wall industrial MEP design-build warehouse with 101 trailer parking.
This project includes three speculative tilt wall industrial facilities, including two cross-dock (36′ clear) and one rear-load (32′ clear), totaling 1,231,318 sf on an 74-acre site in the Passport Industrial Park at DFW Airport.