280,000 SF tilt wall expansion of the existing Caterpillar manufacturing facility.
Project includes structural steel frame, machine line foundations, and MEP 20,000 amp service with centrifugal chiller cooling.
August 15, 2017
280,000 SF tilt wall expansion of the existing Caterpillar manufacturing facility.
Project includes structural steel frame, machine line foundations, and MEP 20,000 amp service with centrifugal chiller cooling.
PROJECT AT A GLANCE | |
---|---|
Project Type | Industrial & Manufacturing |
Client | Caterpillar Inc. |
Location | Schertz, TX |
Delivery Method | Design-Build |
Status | Complete |